How to build a pump track in two minutes 13
Here is a start-to-finish time lapse of the 604 pump track construction. We built the track in seven days over a period of two months. Thanks to everyone who volunteered their time and effort. Special thanks to Matt at North Shore Bike Shop. For more info check out http://dirtwest.blogspot.com
Credit: dirtwestdrkost's videos 15 - 17 of 17 « Previous Next »
13 comments











drkost
3/26/2011 3:11 PM
Video of riding this track here : http://www.vitalmtb.com/videos/member/604-pump-track-first-laps,6268/drkost,1816
drkost
2/25/2011 2:49 PM
Thanks for the comments everyone!
The weather here has been terrible lately. I'll post a ride video as soon as the track dries out.
nopainnogame
2/12/2011 8:30 AM
great!
TBubier
2/11/2011 7:00 AM
WTF! That is impressive. So sick that you guys did that in the middle of winter.
JRAD
2/11/2011 6:54 AM
NICE!!!
thevish
2/10/2011 9:11 PM
wow!
jptree
2/10/2011 9:07 PM
dayum. that track looks so sick. fun for hours right there!!
leelikesbikes
2/10/2011 9:05 PM
Well done!
bizutch
2/10/2011 8:30 PM
Notify me when the videos of riding it pop up!
Stephanie_Aylworth
2/10/2011 8:08 PM
Awesome track. I did the digging thing for 2 days then ended up buying 2 dump truck loads of dirt and renting a bobcat. Kudos to the guys for digging in the snow!
sideshow
2/10/2011 7:27 PM
that was an ingenious way of constructing the the track.
MW
2/10/2011 6:08 PM
Nice work! Nothing like sticking a shove in the dirt. I have built a few that way. Now I'm all about dropping a few hundred for a day rental on a bob cat
Man I love to dig but this vid makes my back hurt. Nice edit.
NoahBrousseau
2/10/2011 6:06 PM
such a sick pumptrack!