Flow Trail in Meeker, Colorado 4

Progressive Trail Design was contracted by the ERBM Parks & Rec. district to build the first trail system in Meeker, Colorado. Along with 2.5 miles of multi-use trail, they also built a mountain bike specific downhill flow trail.

Credit: Progressive Trail Design
Related:
Create New Tag
4 comments
  • SaddleRags

    1/6/2013 7:34 PM

    I'm glad you guys featured this. It's about an hour from me and I had no idea... I'll probably use it to show our local rec dept people what our neighbor has done and see if they want to top it

  • Cougar797

    1/4/2013 10:10 AM

    Its wide because its all machine built. Dozers and mini diggers dont fit on a ribbon of single track. I do like my singletrack myself though.

  • cofattire

    1/4/2013 8:48 AM

    I hate to be negative, but do "flow" trails really need to be wide enough to drive a car down?

  • Josh_Swanke

    1/4/2013 12:54 AM

    So flow trail= sidewalk?

Hello Vital MTB Visitor,

We’re conducting a survey and would appreciate your input. Your answers will help Vital and the MTB industry better understand what riders like you want. Survey results will be used to recognize top brands. Make your voice heard!

Five lucky people will be selected at random to win a Vital MTB t-shirt.

Thanks in advance,

The Vital MTB Crew

Take Survey